Skip to content
All workB2B marketplace
Foundrylane ExchangeIndustrial sourcing & procurement
B2B marketplace

Source engineered parts by what they must do, not what a catalog calls them.

A procurement platform for specification search, supplier qualification, RFQ collaboration, technical equivalency, and revision-controlled sourcing of engineered components.

684Qualified suppliers
1.9mCatalog parts
312Open RFQs
46Engineering reviews

Scale and interface figures on this page are illustrative.

Operating thesis

Revision control is procurement UX.

Industrial sourcing becomes believable only when specifications, drawing revisions, technical deviations, supplier qualification, and commercial quotes stay linked.

01

Fragmented context

Engineers often search by material, standard, dimensions, duty point, drawing, certification, or legacy part—not a normalized product name.

02

Decision logic

An alternate can be commercially attractive but technically unacceptable unless differences are explicit and approved.

03

Operational handoff

RFQs evolve through drawings, Q&A, revisions, quantity breaks, lead times, certifications and approvals.

Product model

Search by engineering intent.

The catalog is organized around specifications and standards so buyers can find parts even when supplier naming is inconsistent.

M01

Spec search

Structured dimensions/materials/standards plus keyword, legacy PN and drawing metadata.

M02

Supplier qualification

Capabilities, processes, certifications, approved status, geography and performance.

M03

Technical comparison

Difference-aware comparison with required/optional attributes and equivalency decision.

M04

RFQ room

Revision-controlled package, Q&A, supplier quote versions and commercial normalization.

M05

Quality handoff

FAI/PPAP/document requirements, deviations and receiving expectations.

Workflow logic

Award the exact thing that was reviewed.

Technical and commercial approvals lock to the RFQ package and drawing revision that suppliers actually quoted.

01DefineBuyer sets required specs + drawing revision
02DiscoverFind qualified suppliers/parts
03RFQIssue package and manage clarifications
04CompareNormalize quote + technical deltas
05AwardEngineering + procurement approval with version lock
Product surfaces

Representative application states.

Representative application states from the product. Figures shown on screen are illustrative.

SCREEN 01 · SEARCH

Specification finder

316SS sanitary pump

FoundrylanePlant 2 · Sourcing
Matches148
Qualified suppliers42
Exact spec11
Lead under 4 weeks7
Refine
Standard
3-A 02-1196
EHEDG31
None21
Connection
2" tri-clamp88
2.5" tri-clamp40
DIN 1185120
Lead time
Under 4 weeks7
4 to 6 weeks64
Over 6 weeks77
Part · supplierMatch on 6 attributesLeadPriceVerdict
A-4412
Helix Process Systems
3.2 wk$18,450Exact
PX-90
Prowell Fluid
5.0 wk$17,900Seal differs
K2-188
Kessel Works
2.5 wk$16,880Flange fails
N-320
Nordfab
4.0 wk$19,200Finish review
AP-77
Ardent Pump
6.5 wk$18,100Exact
V-2210
Vantor Systems
3.8 wk$20,050Standard review

Dots: exact ● / review ◐ / miss ○ across material, standard, connection, duty, motor and finish.

SCREEN 02 · COMPARE

Qualified alternatives

3 assemblies

FoundrylanePlant 2 · Sourcing
Against the requirement

18 attributes, 3 assemblies

Engineer review needed on 2
RequirementA-4412PX-90K2-188
Wetted material
316L stainless
✓ 316L✓ 316L✓ 316L
Sanitary standard
3-A 02-11
✓ 3-A✓ 3-A✓ 3-A
Process connection
2" tri-clamp
✓ 2" TC✓ 2" TC✓ 2" TC
Duty point
120 GPM @ 85 ft
✓ 121 @ 86✓ 120 @ 85✓ 120 @ 87
Motor
TEFC, washdown
✓ TEFC✓ TEFC✓ TEFC
Motor frame
NEMA 184T
✓ 184T✓ 184T≈ 182T
Seal material
EPDM / SiC
✓ EPDM / SiC≈ FKM / SiC≈ FKM / SiC
Flange standard
ASME B16.5 150#
✓ B16.5✓ B16.5✕ DIN PN16
Surface finish
Ra 32 µin
✓ Ra 28✓ Ra 30≈ Ra 40
Material certs
EN 10204 3.1
✓ 3.1✓ 3.1✓ 3.1
Lead time
Under 4 weeks
✓ 3.2 wk≈ 5.0 wk✓ 2.5 wk
Warranty
24 months
✓ 24 mo✓ 24 mo✓ 24 mo
6 more attributesall exactall exactall exact
Result18 exact16 exact
2 review
14 exact
3 review
1 fail

Equivalence is an explicit engineering approval, never inferred from similar catalog text.

SCREEN 03 · RFQ

RFQ-20984

Pump package · Rev C

FoundrylanePlant 2 · Sourcing
Drawing P-188 Rev C supersedes Rev B. Suppliers who quoted Rev B were asked to confirm.
Suppliers5
Responses4
Clarifications7
DueSep 29
Quote levelingHelixProwellKesselNordfabArdent
Unit price$18,450$17,900$16,880$19,200No response
FreightIncluded$620$540Included
Landed cost$18,450$18,520$17,420$19,200
Lead time3.2 wk5.0 wk2.5 wk4.0 wk
Drawing revisionRev CRev CRev BRev C
ExceptionsNoneSeal materialFlange standardNone
CompliantYesReviewNoYes

Kessel is lowest but quoted Rev B with a non-compliant flange. Supplier 04 sent quote v2 with freight separated.

Q-014 · answered
Confirm NEMA motor frame: 184T, TEFC, washdown duty.
Q-017 · open
Prowell asks whether FKM seals are acceptable in place of EPDM.
Q-019 · open
Kessel asks for a Rev C drawing package.
SCREEN 04 · SUPPLIER

Qualification record

Helix Process Systems

FoundrylanePlant 2 · Sourcing
Supplier

Helix Process Systems

ApprovedLast audit Jun 2026
ProcessStatus
316L sanitary fabricationApproved
Orbital weld procedureQualified
PassivationApproved
ElectropolishRevalidation due
CNC machiningApproved
5-axis machiningNot approved
Certificates 4 active
TodayMar 27Sep 27Mar 28Sep 28ISO 9001May 20273-A authorizationFeb 2027ASME IX welder qualsDec 2026ISO 14001Nov 2028
Scorecard, last 12 months
On-time delivery 94Quality (PPM) 91Responsiveness 88Documentation 96Cost 79Audit score 92
SCREEN 05 · QUALITY

Award handoff

PO draft · A-4412

FoundrylanePlant 2 · Sourcing
Purchase order draft

A-4412 · Helix Process Systems

Locked to Rev C
DrawingP-188 Rev C
First articleRequired
PPAPLevel 2
DeviationsNone open
ø 8.00 in flange · 8 × ø 0.75 on ø 7.00 bolt circleRev C: bolt circle ø 7.00 (was ø 6.75)P-188 · Pump package flangeRev C · supersedes Rev B
Revision B to C
Bolt circle ø 6.75 → 7.00Changed
Flange thicknessSame
Surface finish Ra 32Same
Ships with the order
Material certificates 3.1
Dimensional report on first article
PPAP submission, level 2

Receiving inspection locks to the approved revision.

Edge-state design

Failure states are part of the product model.

The cases below are intentionally modeled because real operating software is defined by what happens when data, people, or dependencies do not line up.

EDGE 01

Drawing revision changes after quotes arrive

Mark affected quotes stale and require supplier acknowledgement against the new revision.

EDGE 02

Supplier certification expires

Qualification becomes conditional/blocked for capabilities that depend on that certificate.

EDGE 03

Alternate part differs on required attribute

Force engineering deviation/equivalency review instead of letting price ranking hide the mismatch.

System logic

The data model behind the interface.

The interface follows the domain relationships and rules below.

Canonical objects

PartSpecificationStandardDrawing revisionSupplierQualificationRFQClarificationQuote versionTechnical deviationAward

Domain rules

✓A quote is evaluated against the exact RFQ/drawing revision it answered.
✓Technical equivalency is an explicit approval object, not inferred from similar catalog text.
✓Supplier qualification status is capability/process specific and may expire or require revalidation.
Foundrylane Exchange · Case studyInterface figures are illustrative

Contact

Have something like this to build?

Tell us what you're trying to build and who it's for. If it isn't a fit, we'll say so and point you somewhere better.